Human Exploration LC-39B, Kennedy Space Center, FL
Artemis II
SLS Block 1 NASA
Success
Lifted off Wed 1 Apr 6:35 pm EDT

Light at the pad at T-0 Daylight Sun 13.5° above the horizon, bearing 268° W Sunset 7:40 pm
Launch weather
90% chance of acceptable launch weather
Cumulus Cloud Rule, Ground Winds
45th Weather Squadron , issued . Forecast source
Webcast
NASA's Artemis II Crew Launches To The Moon (Official Broadcast)
Mission timeline
- T-2d 01:50:00Launch team arrives to stations
- T-2d 01:40:00Countdown clock begins
- T-2d 01:40:00Ground systems preparations for vehicle loading
- T-1d 21:30:00Orion spacecraft powered up
- T-1d 18:20:00Core stage powered up
- T-1d 18:10:00Interim cryogenic propulsion stage (ICPS) powered up
- T-1d 15:45:00Final preparations of the four RS-25 engines
- T-1d 11:45:00Interim cryogenic propulsion stage (ICPS) powered down
- T-1d 09:30:00Charge Orion flight batteries to 100%
- T-1d 07:30:00Charge core stage flight batteries
- T-20:15:00Interim cryogenic propulsion stage (ICPS) powered up
- T-15:00:00All non-essential personnel leave the launch pad
- T-14:15:00Air-to-gaseous nitrogen (GN2) changeover and rocket cavity inerting
- T-13:15:00Ground launch sequencer (GLS) activation
- T-12:35:00Built in countdown hold
- T-10:50:00Launch director verifies go for propellant load
- T-10:50:00Orion cold soak
- T-10:40:00Core stage LH2 chilldown
- T-10:40:00Core stage LOX transfer line chilldown
- T-10:25:00Core stage LOX main propulsion system chilldown
- T-09:55:00Core stage LH2 slow fill start
- T-09:50:00Resume T-Clock
- T-09:40:00Core stage LOX slow fill
- T-09:30:00Core stage LOX fast fill
- T-09:25:00Core stage LH2 fast fill
- T-09:05:00ICPS LH2 chilldown
- T-08:30:00ICPS LH2 fast fill start
- T-08:00:00Core stage LH2 topping
- T-07:55:00Core stage LH2 replenish
- T-07:45:00ICPS LH2 vent and relief test
- T-07:20:00ICPS LH2 tank topping start
- T-07:05:00ICPS LH2 replenish
- T-06:40:00Core stage LOX topping
- T-06:40:00ICPS LOX main propulsion system chilldown
- T-06:40:00Orion communications system activated (radio frequency to mission control)
- T-06:30:00ICPS LOX fast fill
- T-06:10:00Closeout crew assemble
- T-06:10:00Stage pad rescue
- T-06:05:00Core stage LOX replenish
- T-06:00:00Check of the weather conditions for launch
- T-05:45:00ICPS LOX vent and relief test
- T-05:30:00ICPS LOX topping
- T-05:10:00All stages replenish
- T-05:10:00Built in countdown hold
- T-05:10:00Closeout crew to white room
- T-05:10:00ICPS LOX replenish
- T-04:40:00Flight crew deployment to pad
- T-04:00:00Flight crew board Orion
- T-03:40:00Crew module hatch preps and closure
- T-03:10:00Counterbalance mechanism hatch sealpress decay checks
- T-02:20:00Crew module hatch service panel install/closeouts
- T-01:40:00Launch abort system (LAS) hatch closure for flight
- T-01:10:00Launch director brief – rocket & thermal protection system scan results with the imagery console
- T-00:50:00Closeout crew departs the pad
- T-00:50:00Final test director briefing is held
- T-00:40:00Built in countdown hold
- T-00:25:00Transition team to Orion to Earth communication loop following final NTD briefing
- T-00:17:00Polling ready ahead of terminal count
- T-00:15:00Flight crew visors down
- T-00:14:00Flight crew short purge verification
- T-00:10:00Start of the terminal countdown towards launch
- T-00:08:00Retraction of the crew access arm from the rocket
- T-00:06:00Orion set to internal power
- T-00:06:00Orion ascent pyros are armed
- T-00:06:00Fuel tanks are pressurized to flight levels
- T-00:05:57Core stage LH2 terminate replenish
- T-00:05:20LAS capability is available
- T-00:04:40GLS go for LH2 high flow bleed check
- T-00:04:30Flight termination system armed
- T-00:04:00Core stage auxiliary power unit (APU) start
- T-00:04:00Core stage LOX terminate replenish
- T-00:03:30ICPS LOX terminate replenish
- T-00:03:10GLS go for purge sequence 4
- T-00:02:02ICPS switches to internal battery power
- T-00:02:00Booster switches to internal batter power
- T-00:01:30Core stage switches to internal power
- T-00:01:20ICPS enters terminal countdown mode
- T-00:00:50ICPS LH2 terminate replenish
- T-00:00:33Launch director verifies go for launch
- T-00:00:30Core stage flight computer to automated launching sequencer
- T-00:00:12Hydrogen burn off igniters initiated
- T-00:00:10Core stage engine start
- T-00:00:06Start of the engine ignition sequence
- T+00:00:00Ignition of the solid rocket boosters.
- T+00:00:00First upwards movement of the rocket
- T+00:00:09The launch vehicle clears the launch tower and initiates a roll/pitch maneuver
- T+00:00:56Vehicle is supersonic
- T+00:01:10Maximum dynamic pressure
- T+00:02:08The solid rocket boosters are separated from the launcher.
- T+00:03:18The launch escape system is no longer needed and is jettisoned.
- T+00:08:06Cut-off of the main engine
- T+00:08:18Separation of the second stage from the first
- T+00:08:28ICPS RL10 nozzle extension
- T+00:20:00Orion solar arrays deploy
- T+00:49:00Perigee raise burn
- T+01:47:57Apogee raise burn
- T+03:24:15Orion separates from ICPS
- T+04:35:00Proximity operations conclude
- T+04:52:00Orion upper stage separation burn
- T+05:00:00Disposal burn of ICPS into the Pacific Ocean
- T+05:04:00CubeSats deploy
- T+13:44:00Perigee raise burn
- T+1d 01:37:00Translunar injection burn
- T+1d 23:25:00Orbital trajectory correction burn
- T+2d 00:07:00Orbital trajectory correction burn
- T+2d 02:05:00Crew CPR demonstration
- T+2d 05:25:00Communications test through Deep Space Network
- T+3d 00:12:00Orbital trajectory correction burn
- T+3d 03:40:00Review lunar flyby imaging plan
- T+3d 05:45:00Review lunar flyby imaging plan
- T+3d 20:30:00Rapid spacesuits donning and pressurization demonstration
- T+4d 05:23:00Orbital trajectory correction burn
- T+4d 06:59:00Orion enters lunar sphere of influence
- T+4d 22:00:00Lunar flyby and observation begins
- T+5d 01:23:00Closest approach to the Moon
- T+5d 01:26:00Crew reaches maximum distance from Earth for this mission
- T+5d 19:47:00Orion exits lunar sphere of influence
- T+5d 21:10:00Lunar flyby science debrief
- T+6d 04:23:00Orbital trajectory correction burn
- T+7d 01:50:00Radiation shielding demonstration
- T+7d 04:20:00Manual piloting demonstration
- T+7d 23:15:00Orthostatic intolerance garment assessment
- T+8d 02:10:00Orthostatic intolerance garment assessment
- T+8d 04:33:00Orbital trajectory correction burn
- T+8d 20:33:00Orbital trajectory correction burn
- T+8d 22:30:00Crew begins working through entry checklist, including donning entry suits
- T+9d 01:13:00Orion crew and service module separation
- T+9d 01:16:00Orion raise burn
- T+9d 01:33:00Start of the atmospheric re-entry
- T+9d 01:46:00Orion splashdown
- T+9d 01:53:00Orion crew module reaction control system safing
- T+9d 02:01:00Orion Final power down
Mission
Artemis II is the first crewed mission as part of the Artemis program. Artemis II will send a crew of 4 - 3 Americans and 1 Canadian around the moon and return them back to Earth. The mission will test the core systems of NASA's Orion spacecraft including the critical life support system, among other systems which could not be tested during Artemis I due to the lack of crew onboard.
- Provider
- National Aeronautics and Space Administration · 142 launches
- Vehicle
- Space Launch System (SLS) · 2 launches
- Orbit
- Lunar flyby
- Crew
- Gregory R. Wiseman, Victor J. Glover, Christina Koch, Jeremy Hansen
Viewing and airspace
Mission updates
Launch success with Orion separation.
Source for this updateLiftoff.
Source for this updateNew T-0.
Source for this updateExtending hold at T-10 minutes.
Source for this updateUpdated launch weather.
Source for this updateOfficial Webcast by NASA has started
Source for this updateUpdated launch weather.
Source for this updateT-0 is accurate to the second.
Source for this updateUpdated launch weather, 80% GO.
Source for this updateTargeting April 1st.
Source for this updateDelayed to NET April due to upper stage helium leak issue.
Source for this updateReverted back to NET March 6 EST, to be confirmed.
Source for this updateMoved back up to NET March 3, to be confirmed (see also https://x.com/nasaspaceflight/status/2019805496836767830.)
Source for this updateDelayed to NET March, to be confirmed pending additional tests.
Source for this updateDelayed to NET February 8 EST, to be confirmed.
Source for this updateRefined launch window.
Source for this updateUpdated approximate launch time.
Source for this updateAdded launch window.
Source for this updateNET February 5.
Source for this updateMoved up to NET February.
Source for this updateNET April 2026.
Source for this updateNET September 2025.
Source for this updateNET November 2024
Source for this update