launchcontrol.space

As of UTC

Human Exploration LC-39B, Kennedy Space Center, FL

Artemis II

SLS Block 1 NASA

Success

Lifted off Wed 1 Apr 6:35 pm EDT

Space Launch System Artemis II launch (NHQ202604010215)_cropped
Space Launch System Artemis II launch (NHQ202604010215)_croppedPhoto: NASA/Joel Kowsky, NASA Image and Media Guidelines

Light at the pad at T-0 Daylight Sun 13.5° above the horizon, bearing 268° W Sunset 7:40 pm

Launch weather

90% chance of acceptable launch weather

Cumulus Cloud Rule, Ground Winds

Webcast

NASA's Artemis II Crew Launches To The Moon (Official Broadcast)

Mission timeline

  1. T-2d 01:50:00Launch team arrives to stations
  2. T-2d 01:40:00Countdown clock begins
  3. T-2d 01:40:00Ground systems preparations for vehicle loading
  4. T-1d 21:30:00Orion spacecraft powered up
  5. T-1d 18:20:00Core stage powered up
  6. T-1d 18:10:00Interim cryogenic propulsion stage (ICPS) powered up
  7. T-1d 15:45:00Final preparations of the four RS-25 engines
  8. T-1d 11:45:00Interim cryogenic propulsion stage (ICPS) powered down
  9. T-1d 09:30:00Charge Orion flight batteries to 100%
  10. T-1d 07:30:00Charge core stage flight batteries
  11. T-20:15:00Interim cryogenic propulsion stage (ICPS) powered up
  12. T-15:00:00All non-essential personnel leave the launch pad
  13. T-14:15:00Air-to-gaseous nitrogen (GN2) changeover and rocket cavity inerting
  14. T-13:15:00Ground launch sequencer (GLS) activation
  15. T-12:35:00Built in countdown hold
  16. T-10:50:00Launch director verifies go for propellant load
  17. T-10:50:00Orion cold soak
  18. T-10:40:00Core stage LH2 chilldown
  19. T-10:40:00Core stage LOX transfer line chilldown
  20. T-10:25:00Core stage LOX main propulsion system chilldown
  21. T-09:55:00Core stage LH2 slow fill start
  22. T-09:50:00Resume T-Clock
  23. T-09:40:00Core stage LOX slow fill
  24. T-09:30:00Core stage LOX fast fill
  25. T-09:25:00Core stage LH2 fast fill
  26. T-09:05:00ICPS LH2 chilldown
  27. T-08:30:00ICPS LH2 fast fill start
  28. T-08:00:00Core stage LH2 topping
  29. T-07:55:00Core stage LH2 replenish
  30. T-07:45:00ICPS LH2 vent and relief test
  31. T-07:20:00ICPS LH2 tank topping start
  32. T-07:05:00ICPS LH2 replenish
  33. T-06:40:00Core stage LOX topping
  34. T-06:40:00ICPS LOX main propulsion system chilldown
  35. T-06:40:00Orion communications system activated (radio frequency to mission control)
  36. T-06:30:00ICPS LOX fast fill
  37. T-06:10:00Closeout crew assemble
  38. T-06:10:00Stage pad rescue
  39. T-06:05:00Core stage LOX replenish
  40. T-06:00:00Check of the weather conditions for launch
  41. T-05:45:00ICPS LOX vent and relief test
  42. T-05:30:00ICPS LOX topping
  43. T-05:10:00All stages replenish
  44. T-05:10:00Built in countdown hold
  45. T-05:10:00Closeout crew to white room
  46. T-05:10:00ICPS LOX replenish
  47. T-04:40:00Flight crew deployment to pad
  48. T-04:00:00Flight crew board Orion
  49. T-03:40:00Crew module hatch preps and closure
  50. T-03:10:00Counterbalance mechanism hatch sealpress decay checks
  51. T-02:20:00Crew module hatch service panel install/closeouts
  52. T-01:40:00Launch abort system (LAS) hatch closure for flight
  53. T-01:10:00Launch director brief – rocket & thermal protection system scan results with the imagery console
  54. T-00:50:00Closeout crew departs the pad
  55. T-00:50:00Final test director briefing is held
  56. T-00:40:00Built in countdown hold
  57. T-00:25:00Transition team to Orion to Earth communication loop following final NTD briefing
  58. T-00:17:00Polling ready ahead of terminal count
  59. T-00:15:00Flight crew visors down
  60. T-00:14:00Flight crew short purge verification
  61. T-00:10:00Start of the terminal countdown towards launch
  62. T-00:08:00Retraction of the crew access arm from the rocket
  63. T-00:06:00Orion set to internal power
  64. T-00:06:00Orion ascent pyros are armed
  65. T-00:06:00Fuel tanks are pressurized to flight levels
  66. T-00:05:57Core stage LH2 terminate replenish
  67. T-00:05:20LAS capability is available
  68. T-00:04:40GLS go for LH2 high flow bleed check
  69. T-00:04:30Flight termination system armed
  70. T-00:04:00Core stage auxiliary power unit (APU) start
  71. T-00:04:00Core stage LOX terminate replenish
  72. T-00:03:30ICPS LOX terminate replenish
  73. T-00:03:10GLS go for purge sequence 4
  74. T-00:02:02ICPS switches to internal battery power
  75. T-00:02:00Booster switches to internal batter power
  76. T-00:01:30Core stage switches to internal power
  77. T-00:01:20ICPS enters terminal countdown mode
  78. T-00:00:50ICPS LH2 terminate replenish
  79. T-00:00:33Launch director verifies go for launch
  80. T-00:00:30Core stage flight computer to automated launching sequencer
  81. T-00:00:12Hydrogen burn off igniters initiated
  82. T-00:00:10Core stage engine start
  83. T-00:00:06Start of the engine ignition sequence
  84. T+00:00:00Ignition of the solid rocket boosters.
  85. T+00:00:00First upwards movement of the rocket
  86. T+00:00:09The launch vehicle clears the launch tower and initiates a roll/pitch maneuver
  87. T+00:00:56Vehicle is supersonic
  88. T+00:01:10Maximum dynamic pressure
  89. T+00:02:08The solid rocket boosters are separated from the launcher.
  90. T+00:03:18The launch escape system is no longer needed and is jettisoned.
  91. T+00:08:06Cut-off of the main engine
  92. T+00:08:18Separation of the second stage from the first
  93. T+00:08:28ICPS RL10 nozzle extension
  94. T+00:20:00Orion solar arrays deploy
  95. T+00:49:00Perigee raise burn
  96. T+01:47:57Apogee raise burn
  97. T+03:24:15Orion separates from ICPS
  98. T+04:35:00Proximity operations conclude
  99. T+04:52:00Orion upper stage separation burn
  100. T+05:00:00Disposal burn of ICPS into the Pacific Ocean
  101. T+05:04:00CubeSats deploy
  102. T+13:44:00Perigee raise burn
  103. T+1d 01:37:00Translunar injection burn
  104. T+1d 23:25:00Orbital trajectory correction burn
  105. T+2d 00:07:00Orbital trajectory correction burn
  106. T+2d 02:05:00Crew CPR demonstration
  107. T+2d 05:25:00Communications test through Deep Space Network
  108. T+3d 00:12:00Orbital trajectory correction burn
  109. T+3d 03:40:00Review lunar flyby imaging plan
  110. T+3d 05:45:00Review lunar flyby imaging plan
  111. T+3d 20:30:00Rapid spacesuits donning and pressurization demonstration
  112. T+4d 05:23:00Orbital trajectory correction burn
  113. T+4d 06:59:00Orion enters lunar sphere of influence
  114. T+4d 22:00:00Lunar flyby and observation begins
  115. T+5d 01:23:00Closest approach to the Moon
  116. T+5d 01:26:00Crew reaches maximum distance from Earth for this mission
  117. T+5d 19:47:00Orion exits lunar sphere of influence
  118. T+5d 21:10:00Lunar flyby science debrief
  119. T+6d 04:23:00Orbital trajectory correction burn
  120. T+7d 01:50:00Radiation shielding demonstration
  121. T+7d 04:20:00Manual piloting demonstration
  122. T+7d 23:15:00Orthostatic intolerance garment assessment
  123. T+8d 02:10:00Orthostatic intolerance garment assessment
  124. T+8d 04:33:00Orbital trajectory correction burn
  125. T+8d 20:33:00Orbital trajectory correction burn
  126. T+8d 22:30:00Crew begins working through entry checklist, including donning entry suits
  127. T+9d 01:13:00Orion crew and service module separation
  128. T+9d 01:16:00Orion raise burn
  129. T+9d 01:33:00Start of the atmospheric re-entry
  130. T+9d 01:46:00Orion splashdown
  131. T+9d 01:53:00Orion crew module reaction control system safing
  132. T+9d 02:01:00Orion Final power down

Mission

Artemis II is the first crewed mission as part of the Artemis program. Artemis II will send a crew of 4 - 3 Americans and 1 Canadian around the moon and return them back to Earth. The mission will test the core systems of NASA's Orion spacecraft including the critical life support system, among other systems which could not be tested during Artemis I due to the lack of crew onboard.

Provider
National Aeronautics and Space Administration · 142 launches
Vehicle
Space Launch System (SLS) · 2 launches
Orbit
Lunar flyby
Crew
Gregory R. Wiseman, Victor J. Glover, Christina Koch, Jeremy Hansen

Viewing and airspace

1 2 3 4 5 6 ↑ N
Launch Complex 39B · Coastline from the U.S. Census Bureau. Check current restrictions with the FAA.

  1. Space View Park
  2. A. Max Brewer Bridge (causeway)
  3. Parrish Park (Titusville)
  4. Sand Point Park
  5. Kennedy Space Center Visitor Complex (main complex)
  6. LC-39 Observation Gantry

Florida launch viewing spots

Mission updates

  1. Launch success with Orion separation.

    Source for this update
  2. Liftoff.

    Source for this update
  3. New T-0.

    Source for this update
  4. Extending hold at T-10 minutes.

    Source for this update
  5. Updated launch weather.

    Source for this update
  6. Official Webcast by NASA has started

    Source for this update
  7. Updated launch weather.

    Source for this update
  8. T-0 is accurate to the second.

    Source for this update
  9. Updated launch weather, 80% GO.

    Source for this update
  10. Targeting April 1st.

    Source for this update
  11. Delayed to NET April due to upper stage helium leak issue.

    Source for this update
  12. Reverted back to NET March 6 EST, to be confirmed.

    Source for this update
  13. Moved back up to NET March 3, to be confirmed (see also https://x.com/nasaspaceflight/status/2019805496836767830.)

    Source for this update
  14. Delayed to NET March, to be confirmed pending additional tests.

    Source for this update
  15. Delayed to NET February 8 EST, to be confirmed.

    Source for this update
  16. Refined launch window.

    Source for this update
  17. Updated approximate launch time.

    Source for this update
  18. Added launch window.

    Source for this update
  19. NET February 5.

    Source for this update
  20. Moved up to NET February.

    Source for this update
  21. NET April 2026.

    Source for this update
  22. NET September 2025.

    Source for this update
  23. NET November 2024

    Source for this update

Subscribe to a calendar