launchcontrol.space

As of UTC

Communications LC-36A, Cape Canaveral, FL

BlueBird 7 (Block 2 #2)

New Glenn Blue Origin

Failure

Lifted off Sun 19 Apr 7:25 am EDT

New Glenn on the launch pad (Escapade)
New Glenn on the launch pad (Escapade)Photo: Blue Origin, Blue Origin Terms of Use

Light at the pad at T-0 Daylight Sun 6.1° above the horizon, bearing 80° E Sunrise 6:52 am

LandingDrone ship · LPV1, 575 km downrange

Sonic boom unlikelyBooster lands on a drone ship far offshore; a sonic boom on land is unlikely.

Launch weather

90% chance of acceptable launch weather

Cumulus Cloud Rule, Thick Cloud Layers Rule

Webcast

Replay: New Glenn Mission NG-3 Webcast

Mission timeline

  1. T-04:30:00Start of propelland loading
  2. T-00:45:00End of propellant loading
  3. T-00:30:00Check of the weather conditions for launch
  4. T-00:17:00Polling ready ahead of terminal count
  5. T-00:04:00Start of the terminal countdown towards launch
  6. T-00:02:30Fuel tanks are pressurized to flight levels
  7. T-00:01:30Launch vehicle switches to internal power sources
  8. T-00:00:30The onboard computer takes control over the countdown and runs last checks
  9. T-00:00:30Water deluge systems turn on
  10. T-00:00:05Start of the engine ignition sequence
  11. T+00:00:00First upwards movement of the rocket
  12. T+00:01:36Maximum dynamic pressure
  13. T+00:03:05Cut-off of the main engine
  14. T+00:03:09Separation of the second stage from the first
  15. T+00:03:16First start of the second engine
  16. T+00:03:42Separation of the payload fairing
  17. T+00:07:06Start of the boosters atmospheric entry burn
  18. T+00:07:37End of the boosters atmospheric entry burn
  19. T+00:08:45Start of the boosters landing burn
  20. T+00:09:23Landing of the boosters
  21. T+00:13:01First cut-off of the second engine
  22. T+01:09:41Second start of the second engine
  23. T+01:10:49Second cut-off of the second engine
  24. T+01:15:44Final deployment of the payload from the rocket
  25. T+02:49:12Third start of the second engine
  26. T+02:49:24Third cut-off of the second engine
  27. T+03:05:08End of the launch vehicle's mission

Mission

AST SpaceMobile’s Block 2 BlueBird satellites are designed to deliver up to 10 times the bandwidth capacity of the BlueBird Block 1 satellites, required to achieve 24/7 continuous cellular broadband service coverage in the United States, with beams designed to support a capacity of up to 40 MHz, enabling peak data transmission speeds up to 120 Mbps, supporting voice, full data and video applications. The Block 2 BlueBirds, featuring as large as 2400 square foot communications arrays, will be the largest satellites ever commercially deployed in Low Earth orbit once launched. This launch will feature 1 satellite, BlueBird 7/BlueBird Block 2 FM2.

Provider
Blue Origin · 41 launches
Vehicle
New Glenn · 3 launches
Orbit
Low Earth Orbit

Boosters

GS1-SN002

Flight
2
Turnaround
156 days
Landing
Drone ship · Jacklyn

Viewing and airspace

1 2 3 4 5 6 ↑ N
Launch Complex 36A · Coastline from the U.S. Census Bureau. Check current restrictions with the FAA.

  1. Kennedy Space Center Visitor Complex (main complex)
  2. LC-39 Observation Gantry
  3. Apollo/Saturn V Center (Banana Creek viewing area)
  4. Playalinda Beach (Canaveral National Seashore)
  5. KARS Park I
  6. Jetty Park (beach & day park)

Florida launch viewing spots

Mission updates

  1. Launch failure.

    Source for this update
  2. Spacecraft separation; launch outcome pending.

    Source for this update
  3. Liftoff.

    Source for this update
  4. New T-0.

    Source for this update
  5. Hold at T-3:57.

    Source for this update
  6. Unofficial Webcast by Spaceflight Now has started

    Source for this update
  7. Updated launch weather, 90% GO.

    Source for this update
  8. GO for launch.

    Source for this update
  9. NET April 19, TBC.

    Source for this update
  10. Delayed to NET April 18, TBC.

    Source for this update
  11. Delayed to NET April 17.

    Source for this update
  12. NET April 16.

    Source for this update
  13. NET April 14.

    Source for this update
  14. NET April 12 per air space closure notices.

    Source for this update
  15. NET April 10.

    Source for this update
  16. NET March.

    Source for this update
  17. Launch moved to New Glenn, NET late February.

    Source for this update
  18. NET January.

    Source for this update
  19. NET Q1 2026.

    Source for this update
  20. Added launch.

    Source for this update

Subscribe to a calendar