launchcontrol.space

As of UTC

Test Flight SLC-2W, Vandenberg, CA

Stairway to Seven

Firefly Alpha Firefly Aerospace

Success

Lifted off Wed 11 Mar 5:50 pm PDT

60°30°0°T-06 amnoonmidnight6 am
Sun (solid) and moon (dashed) over SLC-2W, twelve hours either side of T-0Computed for the pad

Light at the pad at T-0 Daylight Sun 14.8° above the horizon, bearing 255° WSW Sunset 7:07 pm

Webcast

Alpha Flight 7 "Stairway To Seven"

Mission timeline

  1. T-00:00:02Start of the engine ignition sequence
  2. T+00:00:00First upwards movement of the rocket
  3. T+00:00:55Vehicle is supersonic
  4. T+00:01:06Maximum dynamic pressure
  5. T+00:02:32Cut-off of the main engine
  6. T+00:02:35Separation of the second stage from the first
  7. T+00:02:38Start of the second engine
  8. T+00:03:03Separation of the payload fairing
  9. T+00:08:02Cut-off of the second engine

Mission

Firefly Alpha's Flight 7 is a test flight and return-To-Flight for the launch vehicle after its April 2025 launch failure. It will test and validate key systems ahead of Firefly’s Block II configuration upgrade on Flight 8 that’s designed to enhance reliability and manufacturability across the vehicle. Flight 7 is the last flown in Alpha’s current configuration and will test multiple Block II subsystems, including the in-house avionics and thermal improvements, to gain flight heritage and validate lessons learned ahead of the full configuration upgrade on Flight 8. This launch also delivered a demonstrator payload for Lockheed Martin.

Provider
Firefly Aerospace · 7 launches
Vehicle
Firefly Alpha · 7 launches
Orbit
Low Earth Orbit

Mission updates

  1. Launch success.

    Source for this update
  2. Liftoff.

    Source for this update
  3. Official Webcast by Firefly Aerospace has started

    Source for this update
  4. Rescheduled for March 11 PDT.

    Source for this update
  5. Scrubbed due to off-nominal readings during fluids loading.

    Source for this update
  6. Confirmed rescheduled for today.

    Source for this update
  7. Reverted to NET March TBD.

    Source for this update
  8. Scrubbed for the day due to sensor issue.

    Source for this update
  9. GO for launch.

    Source for this update
  10. NET March 10 UTC, to be confirmed.

    Source for this update
  11. Scrubbed for the day due to upper level winds.

    Source for this update
  12. New T-0.

    Source for this update
  13. Holding for upper level winds.

    Source for this update
  14. Delayed to March 1 PST due to upper level winds.

    Source for this update
  15. Tweaked launch window.

    Source for this update
  16. Delayed to NET February 28 PST due to launch site weather.

    Source for this update
  17. Updated launch window.

    Source for this update
  18. Delayed to NET February 27 PST.

    Source for this update
  19. Delayed to NET February 20 PST per new marine navigation warnings.

    Source for this update
  20. GO for launch, NET February 18 PST.

    Source for this update
  21. NET February 14 UTC, to be confirmed.

    Source for this update
  22. Added launch.

    Source for this update

Subscribe to a calendar