launchcontrol.space

As of UTC

Communications SLC-40, Cape Canaveral, FL

Starlink Group 10-43

Falcon 9 Block 5 SpaceX

Success

Lifted off Thu 4 Jun 6:26 am EDT

Starlink night fairing
Starlink night fairingPhoto: SpaceX, CC BY-NC 2.0

Light at the pad at T-0 Golden hour Sun 0.4° below the horizon, bearing 64° ENE Sunrise 6:24 am

LandingDrone ship · ASOG, 600 km downrange

Sonic boom unlikelyBooster lands on a drone ship far offshore; a sonic boom on land is unlikely.

Launch weather

95% chance of acceptable launch weather

Cumulus Cloud Rule

Webcast

Starlink Mission

Watch webcast

Mission timeline

  1. T-00:38:00Launch director verifies go for propellant load
  2. T-00:35:00Start of propelland loading
  3. T-00:35:00Start of liquid oxygen loading in the first stage
  4. T-00:16:00Start of liquid oxygen loading in the second stage
  5. T-00:07:00Start of engine chilling
  6. T-00:01:00The onboard computer takes control over the countdown and runs last checks
  7. T-00:01:00Fuel tanks are pressurized to flight levels
  8. T-00:00:45Launch director verifies go for launch
  9. T-00:00:03Start of the engine ignition sequence
  10. T+00:00:00First upwards movement of the rocket
  11. T+00:01:10Maximum dynamic pressure
  12. T+00:02:26Cut-off of the main engine
  13. T+00:02:29Separation of the second stage from the first
  14. T+00:02:36First start of the second engine
  15. T+00:02:58Separation of the payload fairing
  16. T+00:06:05Start of the atmospheric entry burn
  17. T+00:06:27End of the atmospheric entry burn
  18. T+00:08:01Start of the first stage landing burn
  19. T+00:08:23Landing of the first stage
  20. T+00:08:40First cut-off of the second engine
  21. T+00:51:21Second start of the second engine
  22. T+00:51:22Second cut-off of the second engine
  23. T+01:00:43Deployment of the Starlink stack from the rocket

Mission

A batch of 29 satellites for the Starlink mega-constellation - SpaceX's project for space-based Internet communication system.

Provider
SpaceX · 748 launches
Vehicle
Falcon 9 · 648 launches
Orbit
Low Earth Orbit

Boosters

B1090

Flight
12
Turnaround
78 days
Landing
Drone ship · A Shortfall of Gravitas

Viewing and airspace

1 2 3 4 5 6 ↑ N
Space Launch Complex 40 · Coastline from the U.S. Census Bureau. Check current restrictions with the FAA.

  1. Space View Park
  2. A. Max Brewer Bridge (causeway)
  3. Parrish Park (Titusville)
  4. Sand Point Park
  5. Kennedy Space Center Visitor Complex (main complex)
  6. LC-39 Observation Gantry

Florida launch viewing spots

Mission updates

  1. Launch success.

    Source for this update
  2. Liftoff!

    Source for this update
  3. Unofficial Re-stream by SPACE AFFAIRS has started

    Source for this update
  4. Now targeting Jun 04 at 10:26 UTC

    Source for this update
  5. Now targeting Jun 04 at 10:01 UTC

    Source for this update
  6. Now targeting Jun 04 at 09:53 UTC

    Source for this update
  7. Now targeting Jun 04 at 08:00 UTC (Weather 95% GO per https://45thweathersquadron.nebula.spaceforce.mil/assets/LaunchForecasts/Falcon%209%20Starlink%2010-43%20L-1%20Forecast%20-%204%20Jun%20Launch.pdf)

    Source for this update
  8. Adjusting next possible window according to the FAA.

    Source for this update
  9. Lauch scrubbed, new date tbd. Next possible attempt June 4th according to FAA.

    Source for this update
  10. Now targeting Jun 03 at 11:45 UTC

    Source for this update
  11. Now targeting Jun 03 at 10:45 UTC

    Source for this update
  12. Now targeting Jun 03 at 10:11 UTC

    Source for this update
  13. Updated launch weather, 30% GO.

    Source for this update
  14. Added launch.

    Source for this update

Subscribe to a calendar