launchcontrol.space

Schedule as of .

Space Launch Complex 40 · Cape Canaveral SFS, FL, USA

Falcon 9 Block 5 | Globalstar 2-R Mission 1 (x 8)

Falcon 9 · SpaceX

Launch Successful

Add to calendar Florida viewing

Launch window

to

Falcon 9 liftoff from LC-39A
Image credit: SpaceX · CC BY-NC 2.0
Light at the pad at T-0 astronomical, sun -15.4°

LandingReturn to launch site · LZ-40

Sonic boom likelyBooster returns to land at LZ-40; expect a sonic boom around 7–8 minutes after liftoff.

Launch weather

90% chance of acceptable launch weather

Anvil Cloud Rules, Cumulus Cloud Rule

Webcast

Globalstar 2-R Launch 1 Mission

Watch webcast

Mission timeline

  1. T-00:38:00Launch director verifies go for propellant load
  2. T-00:35:00Start of propelland loading
  3. T-00:35:00Start of liquid oxygen loading in the first stage
  4. T-00:16:00Start of liquid oxygen loading in the second stage
  5. T-00:07:00Start of engine chilling
  6. T-00:01:00The onboard computer takes control over the countdown and runs last checks
  7. T-00:01:00Fuel tanks are pressurized to flight levels
  8. T-00:00:45Launch director verifies go for launch
  9. T-00:00:03Start of the engine ignition sequence
  10. T+00:00:00First upwards movement of the rocket
  11. T+00:01:06Maximum dynamic pressure
  12. T+00:02:12Cut-off of the main engine
  13. T+00:02:15Separation of the second stage from the first
  14. T+00:02:17First start of the second engine
  15. T+00:02:20Flip maneuver of the first stage
  16. T+00:02:29Start of the booster boostback burn
  17. T+00:02:58Separation of the payload fairing
  18. T+00:03:24End of the booster boostback burn
  19. T+00:06:14Start of the atmospheric entry burn
  20. T+00:06:31End of the atmospheric entry burn
  21. T+00:07:30Start of the first stage landing burn
  22. T+00:07:54Landing of the first stage
  23. T+00:08:20First cut-off of the second engine
  24. T+00:52:14Second start of the second engine
  25. T+00:52:26Second cut-off of the second engine
  26. T+00:56:29Start of the payload deployment sequence
  27. T+01:02:42End of the payload deployment sequence.

Mission

The Globalstar global mobile communications network offers global, digital real time voice, data and fax services via its Low Earth Orbit satellite constellation. The constellation operates in a 1410 km orbit inclined at 52 degrees. In early 2022, Globalstar contracted with MDA for the construction of 17 new 2nd generation refresh satellites to replenish the existing constellation. Rocket Lab is sub-contracted to build the satellites' buses and the launch dispensers.

Provider
SpaceX · 748 launches
Vehicle
Falcon 9 · 648 launches
Orbit
Low Earth Orbit

Boosters

B1090

Flight
14
Turnaround
41 days
Landing
Return to launch site · Landing Zone 40

Viewing and airspace

1 2 3 4 5 6 ↑ N
Space Launch Complex 40 · Coastline from the U.S. Census Bureau. Check current restrictions with the FAA.

  1. Space View Park
  2. A. Max Brewer Bridge (causeway)
  3. Parrish Park (Titusville)
  4. Sand Point Park
  5. Kennedy Space Center Visitor Complex (main complex)
  6. LC-39 Observation Gantry

Florida launch viewing spots

Mission updates

  1. Launch success, all satellites successfully deployed.

    Source for this update
  2. Liftoff.

    Source for this update
  3. Unofficial Re-stream by SPACE AFFAIRS has started

    Source for this update
  4. Tweaked T-0.

    Source for this update
  5. Updated launch weather, 90% GO.

    Source for this update
  6. Rescheduled for August 16 UTC.

    Source for this update
  7. Tweaked T-0.

    Source for this update
  8. NET August 16 UTC, TBC.

    Source for this update
  9. NET August.

    Source for this update
  10. Reverted back to NET June TBD.

    Source for this update
  11. NET June 20, TBC.

    Source for this update
  12. NET early June.

    Source for this update
  13. Postponed to May TBD.

    Source for this update
  14. Updated launch window.

    Source for this update
  15. Delayed to May 20.

    Source for this update
  16. Delayed to May 18.

    Source for this update
  17. GO for launch.

    Source for this update
  18. NET May.

    Source for this update
  19. NET 1H 2026.

    Source for this update
  20. NET Q4.

    Source for this update
  21. Added launch.

    Source for this update

Subscribe to a calendar