launchcontrol.space

As of UTC

Technology Rocket Lab LC-2, Wallops Flight Facility, Virginia

Don't Be Such A Square (STP-S30)

Electron Rocket Lab

Success

Lifted off Thu 18 Dec 12:03 am EST

60°30°0°T-0noon6 pm6 amnoon
Sun (solid) and moon (dashed) over Rocket Lab LC-2, twelve hours either side of T-0Computed for the pad

Light at the pad at T-0 Night Sun 75.5° below the horizon, bearing 4° N No moon

Launch weather

80% chance of acceptable launch weather

Webcast

Rocket Lab - 'Don't Be Such A Square' Launch

Mission timeline

  1. T-00:02:00The onboard computer takes control over the countdown and runs last checks
  2. T-00:00:02Start of the engine ignition sequence
  3. T+00:00:00First upwards movement of the rocket
  4. T+00:01:11Vehicle is supersonic
  5. T+00:01:14Maximum dynamic pressure
  6. T+00:02:40Cut-off of the main engine
  7. T+00:02:44Separation of the second stage from the first
  8. T+00:02:47Start of the second engine
  9. T+00:03:41Separation of the payload fairing
  10. T+00:06:40Electron Second stages switches to a new set of batteries and jettisons the depleted ones.
  11. T+00:09:19Cut-off of the second engine
  12. T+00:09:23Separation of the kick stage from the previous stage
  13. T+00:53:44Start of the kick stage engine
  14. T+00:55:30Cut-off of the kick stage engine
  15. T+00:55:30Final deployment of the payload from the rocket

Mission

STP-S30 is a complex mission that will deliver research experiments and technology demonstrations to orbit for the DoD and contribute to future space systems development. The projected primary payload, DISKSat, will demonstrate sustained very low earth orbit (VLEO) flight and test a unique, 1-meter diameter, disk-shaped satellite bus that is designed to increase on-orbit persistence.

Provider
Rocket Lab · 100 launches
Vehicle
Electron · 100 launches
Orbit
Low Earth Orbit

Mission updates

  1. Launch success.

    Source for this update
  2. All 4 spacecraft has separated.

    Source for this update
  3. Liftoff.

    Source for this update
  4. Tweaked T-0 and weather forecast.

    Source for this update
  5. Updated launch weather, 70% GO.

    Source for this update
  6. GO for launch.

    Source for this update
  7. GO for launch (launch window is per https://forum.nasaspaceflight.com/index.php?topic=63362.msg2742010#msg2742010).

    Source for this update
  8. Moved back to NET December with appearance of possible marine navigation warnings NET December 18; to be confirmed as for this launch.

    Source for this update
  9. NET December 8.

    Source for this update
  10. NET late 2025.

    Source for this update
  11. Added launch

    Source for this update

Subscribe to a calendar